highlight
Norm’s team has been part of the site longer than most of the staff, they know every crane here.
Rooty Hill Mini Mill
location:
Rooty Hill, NSW
scope:
Ongoing maintenance & breakdown service for over 20 years.
outcome:
Decades of uptime and compliance for one of Sydney’s key steel producers.

highlight
Quickly diagnosed and corrected the real cause of a crane fault, preventing significant unnecessary expenditure and restoring confidence in the equipment.
Southern Steel sheet & Coil
location:
Milperra, NSW
scope:
Full maintenance recovery, overhaul of hoists and systems neglected by prior contractor.
outcome:
Downtime eliminated after first six months; zero critical breakdowns in five years.

highlight
They only see us every quarter now, and call just to say g’day.
Coil Processors
location:
Warragamba, NSW
scope:
3-monthly service program and compliance management.
outcome:
Zero unscheduled breakdowns for over three years.

highlight
Quick turnaround with minimal downtime.
East Coast Steel
location:
Sydney, NSW
scope:
Emergency repairs and component sourcing for obsolete crane models.
outcome:
Restored operation using new upgraded components.

highlight
Keeping the cranes compliant and safe for future use.
Simec Tunnelling (Picton & Tahmoor)
location:
NSW
scope:
Crane maintenance and upgrades during multi-year tunnelling project.
outcome:
Full compliance and zero safety incidents during 3-year contract.

highlight
All alterations completed and delivered on time.
Ayva Packaging Install
location:
Wetherill Park, NSW
scope:
Installation of a twin runway system for overhead cranes.
outcome:
Runways modified and repositioned to suit the client’s final layout.

highlight
First project designing and building two custom cranes, each with three hoists of different capacities, integrated to safely lift a combined load.
Davcron Engineering
location:
Auburn, NSW
scope:
Design, fabrication and installation of crane runway and two custom triple-hoist overhead cranes.
outcome:
Installation and commissioning completed ahead of the due date.

highlight
Compliant runway repairs completed and handed back to production.
Bondi SWTP Repair
location:
Bondi, NSW
scope:
Structural repairs to address long-term rust and corrosion issues.
outcome:
Structural repairs completed in difficult-to-access areas.

highlight
Works completed within the agreed timeframe with minimal production loss.
Ficep Carriage Repair
location:
Southern Steel, Milperra, NSW
scope:
Repair of a damaged feed carriage following worn component failure.
outcome:
Complete carriage rebuild and full functional testing.

highlight
Involved from unloading the containers through to tightening the last terminal connection.
New Voortman
location:
Southern Steel, Milperra, NSW
scope:
Complete installation of a Voortman beamline system spanning two bays.
outcome:
Full installation, testing and handover.

highlight
The view from the launcher over the M4 Extension project.
M4 Extension Girder Launcher
location:
Clyde, NSW
scope:
Repairs to the girder launcher crane following gearbox failures, plus ongoing gearbox maintenance during the project.
outcome:
Rebuilt gearboxes installed and commissioned.

highlight
First overseas project.
Vanuatu Export Project
location:
Port Vila, Vanuatu
scope:
Complete design, fabrication and shipping of support structure (5.6m modular sections).
outcome:
Fully functional, compliant installation abroad, assembled by Norm’s team on-site.
Project gallery

Infrabuild crane install

Project gallery

IAP Transfer

Project gallery

Forbes Silos

Project gallery

Ficep bandsaw wheel repair

Project gallery

Boat Relocation

Project gallery

Site cranes

Project gallery

Simec guide roller

Project gallery

O'Brien Gosford

Project gallery

Newcastle crane install

Project gallery

infrabuild crane install

Site cranes

iap transfer

Simec guide roller

forbes silos

O'Brien Gosford

ficeps bandsaw wheel repair

Newcastle crane install